Main menu:
products > electronically-controlled dispensing units
Winco ZNG 12 (CPU) micro-processor controlled dispensing equipment for the production of ready-to-use disinfectant solutions from concentrate and tap water, for central supply systems, bed pan rinses, hoses and spray lances.
Application areas:
Hospitals, care homes for the elderly, sanatoria, swimming pools, wash rooms, commercial kitchens and many others.
TÜV (Technical control board) certificate: E 801 014 263 4001
BAM DDE 20
Safeties: Your Winco ZNG 12 (CPU) disinfectant mixing and dispensing includes the following safety features: - Pre-warning when the concentrate (disinfecting or cleaning concentrate) levels close to empty - "Empty" signal and automatic cut-out when insufficient concentrate - Automatic cut-out when water supply is insufficient Maintenance: In accordance with German federal health and safety guidelines (BGA/BAM) covering disinfectant mixing and dispensing equipment all such devices should be subject to routine maintenance at least annually. We recommend that users take out a service and maintenance contract. Checking the concentration level The concentration level of the solution is shown on the LED indicator. Operation - open the access door on the machine - screw the container of disinfectant concentrate into place - insert the suction tube into the container of concentrate - close the access door on the machine - set the control to the required dispensing rate - your Winco ZNG 12 (CPU) is now ready to use Concentrates The solution can be adjusted to suit most commercially available water miscible disinfectant/cleaning concentrates. Mixing rate: Electronically adjustable from 0.25 % - 3.0 %. Further concentration levels as requested. |
|
D010275 | Winco dispensing equipment for the production of ready-to-use disinfectant solutions, Winco ZNG 12 (CPU) series Built in the line with dimensional drawings M 326, isolated from the water supply in accordance with DIN 1988 Part 4 using a system isolator, alternatively an (DVGW) approved back-pressure pipe isolator, flow rate 12 litres per minute, output pressure to 6.0 bar, min. flow pressure 2.0 bar, adjustable concentration level between 0.25% and 3.0%. Principal components 1. Mains water supply isolated as a system isolator alternatively pipe isolator in accordance with DIN 1988 Part 4 1.1 R ½" constant pressure regulator 2. Full electronically impulse counter to control the metering pump 3. Metering unit consisting or reciprocating piston pump with chemically resistant parts, 24V/50Hz. 4. Micro-processor control with 5 V safety voltages, power section and control unit separately in plastic housing 4.1 Control box with precision controls and stepped dial switch for reading and setting the desired concentration level 5. PVC plastic suction tube, overall length 365 mm, Æ 30 mm diameter with probe for measuring the level of concentrate remaining in the original container (5 litres) 6. Stainless steel housing (special version on request), material no 1.4301, or similar Dimensions Winco ZNG 12 (CPU): H = 600 mm, B = 380 mm, W = 210 mm 7. Fluid connectors: water inlet R ½" solution outlet R ½" drainage pipe isolator alternatively system isolator (- 32 mm, PVC) R 1" 8. Electrical connection 230 V, 50 Hz, installed safety fuse 6.0 A 9. Settings and operating conditions are shown by the LCD-display. Faults are additionally signalised by a red LED The warning lights are mounted in the front access panel |
D010260 |
Accessories if requested (not included in our delivery) In-wall mounting model with a movable mounting frame of stainless-steel, L-beam, dimensions as per sheet M 440.00 |
D010395 | 1 remote signalling to ZLT (extra equipment) 1 Operator instruction manual 1 first filling: barrel 5 l content 1 second filling: barrel 5 l content Delivery terms: ex works, excl. packing Delivery period: 2 weeks approx. Payment: 14 days 2 % discount, 30 days net |
D010231 | Optionally as ZNG 12 CPU GD with Swivelling outlet pipe, chrome-plated brass, R ½" (or a special model in V4 A) |
D900010 | Installation and operator training is carried out by LSK-Wintrich staff. The guarantee period is controlled by legal regulations. Equipment is supplied in accordance with the general terms and conditions of LSK-Wintrich. Assembly, connection and filling are not included in our contract of sale. Maintenance contract as per BAM guideline from 1978; price per maintenance if requested. Note: Please install into the extraction line a sample outlet valve! |